Check the inputs before trusting the total.

These tools apply the formula displayed on each calculator page to the values you enter. A mathematically consistent result can still be unsuitable when its specification, units or cost boundary are wrong.

单位与量纲检查

Convert lengths to consistent units before finding area. Multiply area in m² by GSM in g/m² and divide by 1,000 to obtain kilograms. For a uniform material, thickness in µm multiplied by density in g/cm³ gives estimated GSM. Multilayer structures require layer contributions and retained additions.

参考定义与公制词头:BIPM — The International System of Units 和 NIST — SI 单位。这些来源支持单位体系,但不为 Nalyquo 背书,也不验证我们的软件或认证特定树脂密度。

优先使用有依据的输入

  • Use supplier-measured complete GSM rather than estimating from a generic density where available.
  • Use net material mass when converting material prices; keep core and shipment tare separate.
  • Use the approved blank or web layout instead of guessing from finished package dimensions.
  • Record whether freight, tooling and components are included before adding them.

默认材料密度

The following values are editable planning assumptions used by the current tools. They are not grade-specific measurements and currently have no linked supplier certificate. Replace them with the actual technical data sheet or measured value. A material name does not establish composition or performance.

Default planning densities in g/cm³
材料默认
LDPE0.92
LLDPE0.92
MDPE0.935
HDPE0.95
PE(通用)0.92
PP0.905
BOPP0.905
CPP0.905
PET / BOPET1.39
PA6/尼龙1.14
EVOH1.19
铝箔2.7

损耗与舍入

Where waste is defined on gross input, gross requirement = net requirement ÷ (1 − loss fraction). For 1,000 kg of good output with 5% gross-input loss, this is 1,052.6316 kg. Adding 5% to net demand is a different convention. Preserve intermediate precision; round indivisible items or purchase quantities up as required by the actual order.

验证及其局限

Before recent releases, the application build, TypeScript checks and internal-link checks were run. These checks establish software and page consistency, not independent engineering approval. Visible worked examples allow arithmetic to be reproduced; they are not supplier quotations or field-test results. We do not claim every possible input combination has been independently validated.

重要采购应使用已批准的规格,通过第二次独立计算复核结果。如结果不同,请参阅更正政策,了解需要记录的内容。

首次记录发布: · 更新: · 检查:

自动检查页面完整性、链接和计算示例。不声称经过独立专家审核。