Closure Landed Cost Calculator
Calculate delivered closure cost after distributing freight, tooling and other entered fixed charges across the order.
Use a saved product specification (optional)
Enter your values
First time using this calculator?
Replace the example values with figures from your supplier sheet or measurements. Choose the unit beside each value. Results update as you type; fix any highlighted field before using the result.
GSM means grams per square metre. Net weight excludes the core and other packaging. MOQ means the minimum order quantity. An optional field can stay blank unless the result you need depends on it.
Prices keep the selected currency; changing its label does not convert an exchange rate. Save or export the result after checking your inputs.
Help with order quantity
Enter the usable quantity you actually need. Waste, pack rounding or minimum order effects are added separately where required.
Help with freight for this order
Enter the transport charge for the same shipment or order represented by the other fields. Use 0 only when the supplier has confirmed that freight is included.
Help with tooling allocated to this order
Enter one-time plates, dies, cylinders, moulds or setup charges for the first order. Keep this separate from repeat-order cost.
Unit label only. No currency conversion.
Additional measurements (optional) — some values entered
These are only needed for additional result units or a more detailed estimate. Entered values still affect the result when this section is closed.
Cost per closure
Quoted amounts and all charges use the selected currency without FX conversion.
Do not add freight or components again if the quoted amount already includes them. Duty is an entered monetary amount.
Landed cost/unit = base quote/unit + additional components/unit + (freight + tooling + duty + other) ÷ quantity
0.2 + (250 + 0 + 0 + 0) ÷ 10,000 = 0.225/unitSaved calculations stay in this browser. No account or cloud backup is created.
Save to a product project (optional)
Choose or create a saved product project ↗This is an illustrative example. Saved or transferred values must be checked against your job.
Calculated from your inputs. Confirm specifications with your supplier.
How sensitive is this result to your assumptions?
Vary one input and inspect cost per closure
All other entered inputs stay fixed. Ranges are your scenarios, not statistical confidence or supplier performance predictions. This uses the same validated calculator engine.
The formula, made clear.
Fixed order charges can materially change the economics of a small closure order. Allocating them to each purchased component makes that effect visible alongside the quoted unit price. Use the same closure assembly scope for each supplier, including liner, tamper band, dispensing parts or other items that may be bundled differently.
How to use this calculator
- 01
Choose the quoted closure unit price or total-order quote mode.
- 02
Enter the order quantity and separately charged fixed amounts.
- 03
Read delivered cost per closure and per 1,000.
A calculation you can check
The example shows the landed cost of an order of closures after allocating shipment and tooling charges.
- Quoted closure / dispenser price
- 0.2 EUR/unit
- Order quantity
- 10000 units
- Freight for this order
- 250 EUR
- Tooling allocated to this order
- 0 EUR
- Customs / duty amount
- 0 EUR
- Other fixed order charges
- 0 EUR
0.2 + (250 + 0 + 0 + 0) ÷ 10,000 = 0.225/unitCheck the displayed formula and units against your quotation. Use measured GSM, net weight and actual layout dimensions where available. Default densities are planning assumptions, not certified material properties. Calculated cost does not certify strength, compatibility or safe loading.
Method, units and material assumptions ↗