TOOL 167 / 211

Protective Packaging Set Comparison Calculator

Compare complete qualified sets, including assembly. Higher component cost may be offset by lower assembly time. Damage performance remains a separate requirement.

Use a saved product specification (optional)

Enter your values

First time using this calculator?

Replace the example values with figures from your supplier sheet or measurements. Choose the unit beside each value. Results update as you type; fix any highlighted field before using the result.

GSM means grams per square metre. Net weight excludes the core and other packaging. MOQ means the minimum order quantity. An optional field can stay blank unless the result you need depends on it.

Prices keep the selected currency; changing its label does not convert an exchange rate. Save or export the result after checking your inputs.

EUR
EUR
seconds
seconds
EUR

Label only; no exchange-rate conversion.

Results update as you edit. Nothing is saved until you choose to.
Example result — replace the inputs

Set A material plus assembly

€0.4000/set
Set B material plus assembly€0.3750/set
A minus B cost€0.02500/set

Set cost = Complete material set + Assembly seconds × Labour/hour ÷ 3,600

a = 0.25; b = 0.3; ta = 30; tb = 15; hour = 18 → Set A material plus assembly = 0.4 currency/set; Set B material plus assembly = 0.375 currency/set; A minus B cost = 0.025 currency/set
Example result — replace the sample valuesThe formula works, but the values are illustrative.

Saved calculations stay in this browser. No account or cloud backup is created.

Save to a product project (optional)Choose or create a saved product project ↗

This is an illustrative example. Saved or transferred values must be checked against your job.

Was this result clear?

Calculated from your inputs. Confirm specifications with your supplier.

How sensitive is this result to your assumptions?

Vary one input and inspect set a material plus assembly

All other entered inputs stay fixed. Ranges are your scenarios, not statistical confidence or supplier performance predictions. This uses the same validated calculator engine.

The formula, made clear.

Set cost = Complete material set + Assembly seconds × Labour/hour ÷ 3,600

Compare complete qualified sets, including assembly. Higher component cost may be offset by lower assembly time. Damage performance remains a separate requirement.

How to use this calculator

  1. 01

    Confirm complete material set a, complete material set b, assembly time a, assembly time b, assembly labour per hour.

  2. 02

    Enter consistent units; zero means a confirmed absence of a charge or allowance.

  3. 03

    Review the arithmetic, rounding and limitations before using the result in a purchasing decision.

A calculation you can check

A costs EUR 0.25 + EUR 0.15 assembly = EUR 0.40. B costs EUR 0.30 + EUR 0.075 = EUR 0.375.

Complete material set A
0.25 EUR
Complete material set B
0.3 EUR
Assembly time A
30 seconds
Assembly time B
15 seconds
Assembly labour per hour
18 EUR
a = 0.25; b = 0.3; ta = 30; tb = 15; hour = 18 → Set A material plus assembly = 0.4 currency/set; Set B material plus assembly = 0.375 currency/set; A minus B cost = 0.025 currency/set
Set A material plus assembly€0.4000/set

Check the displayed formula and units against your quotation. Use measured GSM, net weight and actual layout dimensions where available. Default densities are planning assumptions, not certified material properties. Calculated cost does not certify strength, compatibility or safe loading.

Method, units and material assumptions ↗