WERKZEUG 125 / 136

Protective Insert Cost per Shipped Unit Calculator — US Units

Protective Insert Cost per Shipped Unit connects the figures on a US supplier quote with the quantity used by your packaging operation. Build the structure or component list from the supplied specification.

Schutzset kalkulieren.

Beispiel laden

Use quantities per versendete Einheit. A component shared by 12 products uses a quantity of 1 ÷ 12 (0.083333…). Enter a fractional allocation for shippers or pallets; do not include their whole price for every product.

Die Währung ändert nur die angezeigte Einheit. Es erfolgt keine Devisenumrechnung.

COMPONENT 01
Fracht- und Werkzeugkostenanteile

Enter the amount allocated to one versendete Einheit, not the total order charge. These amounts are added once to this line, after quantity × item price. Keep zero where the item price already includes a charge.

Line cost / versendete Einheit: US$0,1800

COMPONENT 02
Fracht- und Werkzeugkostenanteile

Enter the amount allocated to one versendete Einheit, not the total order charge. These amounts are added once to this line, after quantity × item price. Keep zero where the item price already includes a charge.

Line cost / versendete Einheit: US$0,06000

COMPONENT 03
Fracht- und Werkzeugkostenanteile

Enter the amount allocated to one versendete Einheit, not the total order charge. These amounts are added once to this line, after quantity × item price. Keep zero where the item price already includes a charge.

Line cost / versendete Einheit: US$0,08000

COMPONENT 04
Fracht- und Werkzeugkostenanteile

Enter the amount allocated to one versendete Einheit, not the total order charge. These amounts are added once to this line, after quantity × item price. Keep zero where the item price already includes a charge.

Line cost / versendete Einheit: US$0,01500

SchutzverpackungskostenUS$0,3350/ versendete Einheit
Komponenten × Mengen
US$0,3350
Tooling allocation / versendete Einheit
US$0,00000
Freight allocation / versendete Einheit
US$0,00000
Kosten je 1.000 versendete Einheiten
US$335,00
Jährliche Verpackungsausgaben
US$33.500,00
Contribution to packaging cost per versendete Einheit, including entered allocations
KomponenteMengeCost / versendete EinheitAnteil am Gesamtwert
Schaumstoff-Endpolster2,00US$0,180053,73%
Wabenpolster1,00US$0,0600017,91%
Kantenschutz4,00US$0,0800023,88%
Papierfüllmaterialanteil1,00US$0,015004,48%
Gesamt—US$0,3350100,00%

Annual spend = annual finished units × total cost per versendete Einheit. It includes the entered per-unit tooling and freight allocations. No waste, filling cost, tax, storage or transport beyond those allocations is inferred. Komponentenpreise belegen keine Schutzwirkung, Stapelfähigkeit oder Falltestleistung.

Formel und eingesetzte Werte

Zeilenkosten = Menge je Fertigprodukt × Artikelpreis + Werkzeugkostenanteil + Frachtanteil.

Gesamtkosten je Fertigprodukt = Summe aller Zeilenkosten. Komponentenanteil = Zeilenkosten ÷ Gesamtkosten × 100.

Schaumstoff-Endpolster: 2,00 × US$0,09000 + US$0,00000 + US$0,00000 = US$0,1800

Wabenpolster: 1,00 × US$0,06000 + US$0,00000 + US$0,00000 = US$0,06000

Kantenschutz: 4,00 × US$0,02000 + US$0,00000 + US$0,00000 = US$0,08000

Papierfüllmaterialanteil: 1,00 × US$0,01500 + US$0,00000 + US$0,00000 = US$0,01500

Gesamt: 0,1800 + 0,06000 + 0,08000 + 0,01500 = US$0,3350 / versendete Einheit

Je 1.000: 0,3350 × 1,000 = US$335,00

Jährlich: 100.000,00 × 0,3350 = US$33.500,00

Die Formel verständlich erklärt.

Schutzkosten/Versandeinheit = Σ(Komponentenmenge je Versandeinheit × Komponentenstückpreis)

Build protective insert cost per shipped unit from the actual layer or component records rather than a generic material assumption. Enter dimensional specifications in the displayed US units and keep every price paired with its stated denominator. Review the layer contributions and the finished result together before comparing suppliers.

So verwenden Sie diesen Rechner

  1. 01

    Choose the actual materials or components and record their quantities, prices and retained additions.

  2. 02

    Use inches for short dimensions, feet for running length, square feet for coverage and pounds for mass. A US short ton is exactly 2,000 lb; US gallons are not Imperial gallons.

  3. 03

    Review each contribution, then compare the total at the same production quantity and cost boundary.

Eine überprüfbare Berechnung

The worked US scenario below keeps the supplied components, cost boundary and physical quantities explicit. Its dollar prices are illustrative, independent of the interactive example.

An illustrative finished pack uses one $0.21 bottle, one $0.14 closure and one $0.03 label. Quantities here are finished pieces, so changing measurement system does not alter them.

$0.21 + $0.14 + $0.03 = $0.38/pack; 100,000 × $0.38 = $38,000
Material cost per finished packUS$0,3800

Add separately supplied inserts or protection for a protective-kit calculation. Freight, tooling and process loss are excluded from this simple example.

Häufige Fragen

Which units should I use for protective insert cost per shipped unit?

Use the units shown beside each input. Coverage is in ft², mass is in lb and short dimensions are in inches. GSM and g/cm³ remain explicit technical material properties. The matching Metric edition is linked above the calculator.

Can I compare two protective insert cost per shipped unit results directly?

Yes, when both runs use the same specification, purchasing boundary and included charges. Record the component structure and cost basis for each run, then investigate any physical or commercial difference instead of treating the lower number alone as a supplier decision.

Prüfen Sie die angezeigte Formel, die Einheiten und die Annahmen, bevor Sie das Ergebnis verwenden.

Methode, Einheiten und Materialannahmen ↗