Fermetures et distribution US Calculateurs
Bouchons, pompes et ensembles complets.
Coût de 1 000 fermetures
Work out closure cost per 1,000 with US purchasing units. Enter the actual specification and compare the result on a consistent order basis.
Coût d’emballage bouteille et fermeture
Work out bottle + closure packaging cost with US purchasing units. Enter the actual specification and compare the result on a consistent order basis.
Coût rendu des fermetures
Work out closure landed cost with US purchasing units. Enter the actual specification and compare the result on a consistent order basis.
Commande de fermetures avec marge de rejet
Work out closure order with rejection allowance with US purchasing units. Enter the actual specification and compare the result on a consistent order basis.
Avant de commencer
Check that caps, pumps or dispensers match the container specification before comparing costs. For complete assemblies, include every component once and use the actual quantity required per pack.
Données à préparer
Les données exactes dépendent de l’outil. Cette section utilise souvent :
- Prix proposé de la fermeture ou du distributeur
- Quantité commandée
- Transport de cette commande
- Outillage affecté à cette commande
- Devise
- Coût du récipient par unité finie