01 / ProductionIdentify whether the loss rate is a share of gross input or an allowance added to net output. Use the same boundary for startup scrap, trim and rejected production.
Lire le guide ↗02 / ProductionMeasure the complete machine-direction repeat, including registration or gap where required. Count the finished pack positions across the actual web.
Lire le guide ↗03 / ProductionConvert the accepted pack target into gross pack positions, then use repeat and lanes to obtain footage. Apply the purchased width and measured basis weight to get square feet and pounds.
Lire le guide ↗04 / ProductionApply the scrap fraction to gross material consumed. Value those pounds at the purchase price, then deduct only a confirmed credit for the same scrap stream.
Lire le guide ↗05 / ProductionUse full purchased web width, complete repeat and actual lanes. Divide nominal area per pouch by the qualified yield before applying the area price.
Lire le guide ↗