01 / ProduzioneIdentify whether the loss rate is a share of gross input or an allowance added to net output. Use the same boundary for startup scrap, trim and rejected production.
Leggi la guida ↗02 / ProduzioneMeasure the complete machine-direction repeat, including registration or gap where required. Count the finished pack positions across the actual web.
Leggi la guida ↗03 / ProduzioneConvert the accepted pack target into gross pack positions, then use repeat and lanes to obtain footage. Apply the purchased width and measured basis weight to get square feet and pounds.
Leggi la guida ↗04 / ProduzioneApply the scrap fraction to gross material consumed. Value those pounds at the purchase price, then deduct only a confirmed credit for the same scrap stream.
Leggi la guida ↗05 / ProduzioneUse full purchased web width, complete repeat and actual lanes. Divide nominal area per pouch by the qualified yield before applying the area price.