Set up the US purchasing comparison
Record net material, usable coverage and the delivery destination. Normalize the material subtotal before adding separately billed freight and tooling. Keep specification differences beside the price comparison.
Formula and worked US example
Delivered $/ft² = (Material subtotal + Separate order charges) ÷ Usable ft²
Offer A supplies 25,000 ft² at $0.015/ft²: $375 material plus $80 freight, or $455 delivered. Offer B supplies the same area at $0.0145/ft²: $362.50 plus $100 freight, or $462.50. A saves $7.50 on this order despite its higher coverage price.
Checks before using the estimate
Match resin, construction, thickness, printing and accepted-output yield. A lower arithmetic cost does not qualify a material for the line.
- Use actual supplier prices in place of these independent illustrative dollar quotes. No exchange rate is implied.
- Keep the same technical specification, accepted-output denominator and delivery boundary across alternatives.
Domande comuni
Can I reproduce the US figures in a calculator?
Open a related US calculator below and enter the stated quantities with their matching unit prices. Intermediate values in this article may be rounded.
What should I verify before using this result?
Match resin, construction, thickness, printing and accepted-output yield. A lower arithmetic cost does not qualify a material for the line.