Establish the measurement and quote basis
Read the unit next to the price rather than assuming that a decimal or a comma identifies the quote basis. Record the original notation and currency.
Record the SKU, date, source document and unit beside the observation. Mark an estimate as provisional so it cannot be mistaken for supplier-confirmed data.
Worked purchasing example
EUR 28 per 1,000 pieces equals EUR 0.028/piece. For 12,500 pieces the material amount is EUR 350. EUR 0.03/piece totals EUR 375 before other charges.
These figures are illustrative arithmetic, not market prices or a promised saving. Replace them with measurements and offers covering your actual job.
Turn the result into a decision
After unit conversion, apply the same ordered quantity and confirmed delivery boundary. A per-thousand price is not a promise to supply fractional cartons.
Use the linked calculator to check the same boundary, then include complete known order charges in comparison. Preserve unresolved items in the specification rather than replacing them with zero.
Common questions
Does per thousand mean MOQ is 1,000?
No. The pricing unit and minimum order quantity are separate fields. Confirm full pack multiples and the applicable quantity tier.
Are the example prices current supplier quotes?
No. They are illustrative values chosen to demonstrate the calculation. Enter current confirmed offers for the same specification and quantity.