TOOL 11 / 136

Flexible Packaging Quote Comparison Calculator — US Units

Flexible Packaging Quote Comparison connects the figures on a US supplier quote with the quantity used by your packaging operation. Build the structure or component list from the supplied specification.

Put the quotes on the same basis.

Enter actual supplier GSM when available. Leave unknown dimensions blank: the comparison will state which conversions need more information.

QUOTATION A
Geometry & specification
Order & additional costs
QUOTATION B
Geometry & specification
Order & additional costs

Demand & specification tolerances

Annual spend buys enough full shipments to cover this common demand. Freight is charged for each shipment, and tooling once in the first year. Excess stock is included. MOQ is a minimum constraint, not an assumed shipment size. No process waste, duty, tax, payment terms or inventory carrying costs are included.

Edit specification tolerances

Absolute tolerances compare the highest and lowest entered values. Lanes must match exactly. Structure checks ignore capitalization and repeated spaces only; they do not interpret material equivalence.

Lowest calculated cost ≠ equivalent specification

Entered fields match within your tolerances. This does not establish equivalent specification: barrier, sealing, mechanical properties and approvals still require review.

Material and first-shipment landed cost by supplier. Highlighted values are the lowest calculated cost for that row.
COMPARISON BASISSupplier AUSDSupplier BUSD
Quoted basislbft²
Quoted priceUS$1.4515/lbUS$0.02127/ft²
StructurePET12 / PE60 + 2 GSM adhesivePET12 / PE60 + 2 GSM adhesive
GSM73.88 g/m²73.88 g/m²
Total thickness2.83 mil2.83 mil
Web width31.50 inch31.50 inch
Repeat / lanes9.84 inch / 29.84 inch / 2
MOQ1,102.31 lb1,102.31 lb
Quantity per shipment2,204.62 lb2,204.62 lb
Freight / shipmentUS$250.00US$350.00
One-time toolingUS$600.00US$900.00
Material cost / lbUS$1.4515/lbUS$1.4060/lbLowest calculated cost
Material cost / ft²US$0.02196/ft²US$0.02127/ft²Lowest calculated cost
Material cost / linear footUS$0.05765/ftUS$0.05584/ftLowest calculated cost
Material cost / 1,000 unitsUS$23.64US$22.90Lowest calculated cost
First-shipment landed / lbUS$1.8370/lbLowest calculated costUS$1.9730/lb
First-shipment landed / ft²US$0.02780/ft²Lowest calculated costUS$0.02985/ft²
Shipment material subtotalUS$3,200.00US$3,099.62
First-shipment landed totalUS$4,050.00US$4,349.62
First-year annual spendUS$28,200.00US$28,496.97
Full shipments per year88
Annual purchased 1,000 units1,082.841,082.84

First-shipment landed costs include all entered tooling. Annual spend includes tooling only once. Prices for 1,000 units represent nominal units at the entered repeat and lanes; no waste allowance is applied. Lower cost alone does not establish supplier suitability.

Formula & substituted values

Price/ft² = Price/lb × GSM × 0.0002048161436; Price/ft = Price/ft² × Width(in) ÷ 12; Price/1,000 packs = Price/ft × Repeat(in) ÷ 12 × 1,000 ÷ Lanes

Supplier A

Area price: US$0.02196/ft²

Weight price: US$1.4515/lb

Running-foot price: US$0.05765/ft

Width: 31.50 inch; Repeat: 9.84 inch

Supplier B

Area price: US$0.02127/ft²

Weight price: US$1.4060/lb

Running-foot price: US$0.05584/ft

Width: 31.50 inch; Repeat: 9.84 inch

The formula, made clear.

Price/ft² = Price/lb × GSM × 0.0002048161436; Price/ft = Price/ft² × Width(in) ÷ 12; Price/1,000 packs = Price/ft × Repeat(in) ÷ 12 × 1,000 ÷ Lanes

Build flexible packaging quote comparison from the actual layer or component records rather than a generic material assumption. Enter dimensional specifications in the displayed US units and keep every price paired with its stated denominator. Review the layer contributions and the finished result together before comparing suppliers.

How to use this calculator

  1. 01

    Choose the actual materials or components and record their quantities, prices and retained additions.

  2. 02

    Use inches for short dimensions, feet for running length, square feet for coverage and pounds for mass. A US short ton is exactly 2,000 lb; US gallons are not Imperial gallons.

  3. 03

    Review each contribution, then compare the total at the same production quantity and cost boundary.

A calculation you can check

The worked US scenario below keeps the supplied components, cost boundary and physical quantities explicit. Its dollar prices are illustrative, independent of the interactive example.

Supplier A offers 25,000 ft² at $0.015/ft² with $80 freight. Supplier B offers the same qualified coverage at $0.0145/ft² with $100 freight.

Supplier A delivered
US$455.00
Supplier B delivered
US$462.50
A: 25,000 × $0.015 + $80 = $455; B: 25,000 × $0.0145 + $100 = $462.50
Difference for this purchaseUS$7.5000

Both suppliers must meet the same specification. No currency conversion, tax treatment or supplier qualification is implied.

Frequently asked questions

Which units should I use for flexible packaging quote comparison?

Use the units shown beside each input. Coverage is in ft², mass is in lb and short dimensions are in inches. GSM and g/cm³ remain explicit technical material properties. The matching Metric edition is linked above the calculator.

Can I compare two flexible packaging quote comparison results directly?

Yes, when both runs use the same specification, purchasing boundary and included charges. Record the component structure and cost basis for each run, then investigate any physical or commercial difference instead of treating the lower number alone as a supplier decision.

Check the displayed formula, units and assumptions before using the result.

Method, units and material assumptions ↗